Some of the challenges:
- Provide a solution to exchange 200 reformer tiles. Eliminate cumbersome individual bull-rigging scenarios.
- Minimize turnaround critical path duration.
Solution:
- Track design with multiple gantries.
Some of the challenges:
Solution: