Some of the challenges:
- Minimizing equipment handling.
- Defining equipment installation sequence (120T~470T equipment)
- Scope of Work development
Solution:
- Proposed heavy haul route.
- Redesign steel structure to enable usage of lift frame.
- ITB, RFQ and Technical Scoring Matrix